- A 60,000 sq ft elementary school typically runs 4–7 weeks within the summer window. High school multi-wing campuses run 6–10 weeks or are phased across two summers. We engineer a hard finish 7 days before the first day of school.
- Yes, that is the default. Our summer-window schedule is engineered to a hard 7-day buffer before the first instructional day, with backup tarping kits and dry-in plans for surprise Minnesota storms.
- Yes. All Cozy Roofing crews assigned to school projects are badged and background-checked to a standard compatible with Minnesota school district HR requirements. Documentation is provided to your facility director and HR office.
- Yes, with pre-cleared badged personnel only. Spring-break work is engineered to be weather-tight before students return. In-session work is limited to roof areas not directly above occupied classrooms.
- If the roof has qualifying hail or wind damage, your property policy or MSBAIT coverage typically pays full replacement at like-kind-and-quality minus the deductible. Coverage decisions are made by your insurance carrier; our role is to document the full scope of damage so nothing eligible is overlooked.
- Yes, routinely. We work with every major school district and faith-based carrier including MSBAIT, Travelers, EMC, Hanover, Brotherhood Mutual, Church Mutual, Philadelphia Insurance and Catholic Mutual.
- Yes. We coordinate licensed asbestos abatement subcontractors for older built-up roof systems with asbestos felts or pre-1980 mastics. Documentation is provided for EPA NESHAP, Minnesota Department of Health and district records.
- Yes. Every Cozy Roofing proposal is line-item and fixed-price, brand, color, underlayment, ice-and-water coverage, ventilation, drip edge, valleys, flashings, RTU curbs and disposal all itemized. School boards take the document straight to a vote.
- Yes. We pull the permit in your jurisdiction, schedule final inspection, and provide signed inspection documentation suitable for district records and MDE review.
- Yes. We phase across wings, gymnasiums, media centers, cafeterias and athletic field houses under one PM, one schedule and one warranty. Drone inspections are done campus-wide on day one.
- Steep-slope: TAMKO Heritage, Owens Corning Duration or CertainTeed Landmark. Low-slope: 60-mil TPO from Carlisle or Versico with tapered polyiso. Ventilation calcs are sized per building.
- The Best Friend Warranty is our lifetime craftsmanship warranty. If a workmanship defect ever causes a leak or the loss of installed materials, we fix it at no cost to the original homeowner, for as long as you own your home. The full manufacturer material warranty also applies.
- Yes, Minnesota Class A residential and commercial license #BC793031, $2,000,000 general liability, full Minnesota workers' compensation. Certificates issued before mobilization with the district named as additional insured.
- Yes. For insurance-funded projects we invoice as funds release from the carrier. For district capex we structure milestone payments aligned to school board approval cycles.
- Call (612) 750-6051 or request a free Cozy Check online. A senior PM will meet you on-site within the week, perform a drone-assisted campus-wide inspection, and follow up with a written, line-item proposal ready for school board vote.